That the Report and Specifications for the Sullivan Creek Drain as prepared by Gerard Rood, P.Eng., of Rood Engineering Inc., dated March 1, 2022 (Drainage Report) be received;
And that the Drainage Report for the Sullivan Creek Drain as prepared by Gerard Rood, P.Eng., of Rood Engineering Inc., dated March 1, 2022 be referred back to the Drainage Engineer to consider Excess Soils requirements in accordance with recent information received from Provincial Ministries.