The Drainage Superintendent advised that the Public Information Centre (PIC) held on March 5, 2021 resulted in changes to the report. The affected landowners received the revised drainage report with the notice of consideration that was mailed out. Subsequently, the Town received two calls from landowners identifying new changes to the report. The first change identified was a correction in the minutes of the PIC. The other change indicated a purchase of land in the watershed. This change affected the assessment schedule and changes to the revised report were necessary. He explains that the severance that had taken place on the affected property, is not reflected in the report as appended to the agenda.
The Drainage Superintendent recommends that the report be sent back to the drainage engineer for revisions in the report and that a reconsideration meeting be held at a later date.