Mr. Peter Zuzek presents the "Town of Tecumseh Coastal Flood Risk Assessment" PowerPoint as appended on the agenda. The Consultant provides a background of the study conducted and advises on various options to reduce coastal flood risk and cost estimates for mitigation measures.
The Mayor opens the floor to questions from the Members.
In response to an inquiry, the Consultant indicates more work needs to be done with property owners to come up with solutions to be attractive with mitigation in mind.
The Director Public Works & Environmental Services explains the next steps is to intergrade into the Public Woks and Engineering Services Capital Works Plan with focus on public engagement and how to implement this study.
A Member inquires if there are temporary measures that can be done. The Consultant reviewed some temporary measures there are implemented in Europe which are not optimal for this community.
A Member suggests that this study be circulated to our neighboring municipalities and the County of Essex. The CAO requested that the study be circulated first through the Flood working group for discussion and consideration.